Remove Event Remove Hazard Remove Natural Hazard Remove Resilience
article thumbnail

Resilience is an illusion

Emergency Planning

After much pondering of the question, I have come to the conclusion that resilience is an illusion. This is not to denigrate the work of resilience managers, as there is obviously much to be done to reduce the risk and impact of adverse events. However, the concept of resilience is, I think, suspect. Holling, C.S

article thumbnail

The United Kingdom's National Risk Register - 2023 Edition

Emergency Planning

The new version presents 89 major hazards and threats that could potentially disrupt life in the United Kingdom and possibly cause casualties and damage. Hence, the risk register largely discusses hazards and threats, not risks sensu stricto. (c) This is particularly important for those hazards associated with climate change.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Unlocking Climate Change Resilience Through Critical Event Management and Public Warning

everbridge

In the period 2000 to 2019, there were 7,348 major recorded disaster events claiming 1.23 Floods and storms were the most prevalent events.”. The report “The Human Cost of Disasters 2000-2019” also records major increases in other categories including drought, wildfires , and extreme temperature events.

article thumbnail

Hazardous Conditions: Mitigation Planning and Pandemics

National Center for Disaster Prepardness

state develops a hazard mitigation plan, which identifies top local risks and provides a framework for long term strategies to reduce risk and protect citizens and property from damage. 8 states/territories mention pandemic planning but do not discuss further how the state or agency will be able to mitigate the hazard from the event.

Hazard 64
article thumbnail

Creating effective warnings for all

everbridge

Natural hazards, public health emergencies, and other crises can strike at any moment, putting lives and livelihoods at risk. The “Creating Effective Warnings for All” event not only showcased the various stakeholders’ commitment to safety but also served as a catalyst for innovative dialogue.

article thumbnail

Book Review: Constructing Risk

Recovery Diva

Reviewed by Donald Watson, editor of the website theOARSlist.com , Organizations Addressing Resilience and Sustainability, editor of Time-Saver Standards for Urban Design (McGraw-Hill 2001), and co-author with Michele Adams of Design for Flooding: Resilience to Climate Change (Wiley 2011).

article thumbnail

Community Resilience or Community Dystopia in Disaster Risk Reduction?

Emergency Planning

Yet, faced with natural hazards, relative isolation, economic deprivation and cultural decline, it badly needs social solidarity, and that is something it lacks. In this, I do not exaggerate, as the record of recent events in London demonstrates the connections quite clearly. Hence, 'community' is about influence.