A Toolkit to Build Enterprise Resiliency
eBRP
NOVEMBER 12, 2024
This continuous validation enhances managements confidence and improves response readiness across the organization.
eBRP
NOVEMBER 12, 2024
This continuous validation enhances managements confidence and improves response readiness across the organization.
MHA Consulting
SEPTEMBER 14, 2023
Identify the potential processing impacts at the alternate site. Determine whether a restoration at the alternate site is necessary. Depending on when services can be restored at the primary location, it might not make sense to perform a recovery at the alternate site.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Plan B Consulting
FEBRUARY 11, 2021
To set up such a quarantine scheme takes lots of thought and logistics to be put in place. In the exercise, we simulated the loss of the depot and simulated the staff and vehicles operating from their designated alternative sites. The plan was great until we exercised it! The lorries from all depots headed off to the sorter.
Plan B Consulting
FEBRUARY 11, 2021
To set up such a quarantine scheme takes lots of thought and logistics to be put in place. In the exercise, we simulated the loss of the depot and simulated the staff and vehicles operating from their designated alternative sites. The plan was great until we exercised it! The lorries from all depots headed off to the sorter.
BCP Builder
APRIL 20, 2020
Sustained IT or communications system failure’ Depending on the organization I might have a 4th such as with universities I include ‘loss of research’ or ‘loss of xx (product)’ which could be due to logistics, finance, mechanical failure (such as a production line failure).
BCP Builder
APRIL 20, 2020
Sustained IT or communications system failure’ Depending on the organization I might have a 4th such as with universities I include ‘loss of research’ or ‘loss of xx (product)’ which could be due to logistics, finance, mechanical failure (such as a production line failure).
Erwood Group
JULY 12, 2022
Loss of Workplace : Only one primary site or location is impacted or disrupted at any time. Alternate sites & locations are not impacted and are available for recovery use. What other logistical considerations are required? Disruption Specific Assumptions. Any information/records/inventory/etc. How long can they stay?
Let's personalize your content